Question: __________ is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.
Options
A : Cube Rate Estimate
B : Supplementary Estimate
C : Maintenance Estimate
D : Plinth Area Estimate
Civil Engineering Drawing Different Types Estimates more questions
Which of the following is not a copper releasing IUD?
The shape of the development of the surface shown will....
The Gaussian surface for a point charge will be
Sound intensity is proportional to the _________ of sound pressure.
If a right angled triangle is made to revolute about....
Which of the following sorting algorithm uses the method of....
Compressive strength of hardened concrete is done by _______
Compressive strength of hardened concrete is done by _________
The line of intersection formed is straight line while two....
The line of intersection formed is straight line while two....
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Design Septic Tanks
Civil Engineering Drawing Detailed Specifications
Civil Engineering Drawing Detailed Specifications Road Work 1
Civil Engineering Drawing Developing Network
Civil Engineering Drawing Development Surfaces
Civil Engineering Drawing Earthwork Concrete R C C Work
Civil Engineering Drawing Earthwork Estimation
Civil Engineering Drawing Entrance Exams
Civil Engineering Drawing Estimate Metalled Roads
Civil Engineering Drawing Estimate Singledouble Room Building