Question: __________ is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.

Options

A : Cube Rate Estimate

B : Supplementary Estimate

C : Maintenance Estimate

D : Plinth Area Estimate

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing Different Types Estimates more questions

Which of the following is not a copper releasing IUD?

The shape of the development of the surface shown will....

The Gaussian surface for a point charge will be

Sound intensity is proportional to the _________ of sound pressure.

If a right angled triangle is made to revolute about....

Which of the following sorting algorithm uses the method of....

Compressive strength of hardened concrete is done by _______

Compressive strength of hardened concrete is done by _________

The line of intersection formed is straight line while two....

The line of intersection formed is straight line while two....

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Design Septic Tanks

Civil Engineering Drawing Detailed Specifications

Civil Engineering Drawing Detailed Specifications Road Work 1

Civil Engineering Drawing Developing Network

Civil Engineering Drawing Development Surfaces

Civil Engineering Drawing Earthwork Concrete R C C Work

Civil Engineering Drawing Earthwork Estimation

Civil Engineering Drawing Entrance Exams

Civil Engineering Drawing Estimate Metalled Roads

Civil Engineering Drawing Estimate Singledouble Room Building