A ____________ is defined as accomplishment in planning a project.
Options
A : activity
B : event
C : schedule
D : planning
___________ is defined as a job or action to be completed, between two events within a project.
Options
A : Planning
B : Event
C : Activity
D : Sequence
Once a project is planned in terms of ‘events’ and ‘activities’ what next is important?
Options
A : Schedule
B : Activity
C : Time
D : Finishing
The basic purpose of drawing a network diagram and its analysis is to control the activities strictly limited to time and sequence of events.
Options
A : True
B : False
C :
D :
Total project time is the shortest project time in which the project can be completed.
Options
A : True
B : False
C :
D :
When a project has too many structures then it is prepared separately keeping in view the whole, and a combined critical path of the whole project is prepared linking one another.
Options
A : True
B : False
C :
D :
Critical path is represented by a thin line indicates the line of sequence of activity which must be completed on schedule.
Options
A : True
B : False
C :
D :
In developing a network diagram time flows from right to left.
Options
A : True
B : False
C :
D :
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Dealing Railways
Civil Engineering Drawing Design Road Pavement
Civil Engineering Drawing Design Septic Tanks
Civil Engineering Drawing Detailed Specifications
Civil Engineering Drawing Detailed Specifications Road Work 1
Civil Engineering Drawing Development Surfaces
Civil Engineering Drawing Different Types Estimates
Civil Engineering Drawing Earthwork Concrete R C C Work