Question: A ____________ is defined as accomplishment in planning a project.

Options

A : activity

B : event

C : schedule

D : planning

Click to view Correct Answer

Next

Civil Engineering Drawing Developing Network more questions

What is the mechanism of drug excretion for skin excretion?

In ____ approach, transmitter and receiver are co-located.

Which of the following is false with respect to GPS?

Which type of transducer requires energy to be put into....

Which of the following is energy independent?

GSR(Galvanic skin response) gives ________________

BSR(Basal skin response) gives _____________

How is the assessment of the condition of foetus can....

A mobile robot :

What is the function of antibody?

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Dealing Railways

Civil Engineering Drawing Design Road Pavement

Civil Engineering Drawing Design Septic Tanks

Civil Engineering Drawing Detailed Specifications

Civil Engineering Drawing Detailed Specifications Road Work 1

Civil Engineering Drawing Development Surfaces

Civil Engineering Drawing Different Types Estimates

Civil Engineering Drawing Earthwork Concrete R C C Work

Civil Engineering Drawing Earthwork Estimation

Civil Engineering Drawing Entrance Exams