Question: _______________ estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.

Options

A : Supplementary and revised estimate

B : Maintenance estimate

C : Item rate estimate

D : Revised estimate

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing Different Types Estimates more questions

Most olfactory receptors are located on the _________

____________ scans TCP ports and resolves different hostnames.

Which of the following is not a footprint-scanning tool?

_______ is the part of building constructed above the plinth....

The abbreviation of SCA is ______

_________________ is required for preliminary studies of various aspects of....

In the circuit the dependent source __________

In ______________ system, the partial vacuum is created inside of....

What is the main function of the pentose phosphate pathway?

Which of the following is not the function of a....

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Design Septic Tanks

Civil Engineering Drawing Detailed Specifications

Civil Engineering Drawing Detailed Specifications Road Work 1

Civil Engineering Drawing Developing Network

Civil Engineering Drawing Development Surfaces

Civil Engineering Drawing Earthwork Concrete R C C Work

Civil Engineering Drawing Earthwork Estimation

Civil Engineering Drawing Entrance Exams

Civil Engineering Drawing Estimate Metalled Roads

Civil Engineering Drawing Estimate Singledouble Room Building