Question: In ______________ system, the partial vacuum is created inside of the room by exhausting the vitiated inside air by fans or blowers.

Options

A : Supply

B : Plenum

C : Air conditioning

D : Exhaust

Click to view Correct Answer

Previous || Next

Construction Building Materials Types Ventilation more questions

_______ is the part of building constructed above the plinth....

The abbreviation of SCA is ______

_______________ estimate is a detailed estimate and is prepared to....

_________________ is required for preliminary studies of various aspects of....

In the circuit the dependent source __________

What is the main function of the pentose phosphate pathway?

Which of the following is not the function of a....

The temporary casing is known as the __________

Which of the following is false with respect to the....

Which of the following is a core management feature offered....

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Construction Building Materials Special Foundations

Construction Building Materials Tools Used Stone Masonry

Construction Building Materials Types Drills

Construction Building Materials Types Footing

Construction Building Materials Types Foundation

Construction Building Materials Underpinning Types

Construction Building Materials Well Point System

Corrosion Engineering Aptitude Test

Corrosion Engineering Assessment

Corrosion Engineering Basic