Question: Pick up the correct statement from the following:

Options

A : The operation of removing material from the sea or river bed is known as

B : Dredging

C : Digging

D : None of these.

Click to view Correct Answer

Previous || Next

Docks and Harbours - Part 1 more questions

Pick up the correct statement from the following:

A low wall built out into the sea more or....

At a place the shore line is along North West-South....

If F is the fetch, the straight line distance of....

According to the recommendations of International Navigational Congress in 1912,....

Littoral drift

The heaviest line is used to democrate

Pick up the correct statement function following:

Pick up the correct statement from the following:

Depth of borings for soil investigation, is generally kept below....

Advanced Surveying - Part 1 more Online Exam Quiz

Applied Mechanics - Part 1

Building Construction - Part 1

Building Materials - Part 1

Concrete Technology - Part 1

Construction Management - Part 1

Elements of Remote Sensing - Part 1

Engineering Economy - Part 1

Estimating and Costing - Part 1

GATE Exam Questions - Part 1

Highway Engineering - Part 1