Estimating and Costing - Part 1 Online Exam Quiz
Estimating and Costing - Part 1 GK Quiz. Question and Answers related to Estimating and Costing - Part 1. MCQ (Multiple Choice Questions with answers about Estimating and Costing - Part 1
Pick up the excavation where measurements are made in square metres for payment.
Options
A : Ordinary cuttings up to 1 m
B : surface dressing up to 15 cm depths
C : Surface excavation up to 30 cm depths
D : Both (b) and (c)
The expected out turn of 2.5 cm cement concrete floor per manson per day
Options
A : 2.5 sqm
B : 5.0 sqm
C : 7.5 sqm
D : 10 sqm
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
Options
A : 26, 000 m 3
B : 26, 500 m 3
C : 27, 000 m 3
D : 27, 500 m 3
The correct prismoidal formula for volume is
Options
A : D [first area + last area + ? Even area + 2 ? odd areas]
B : [first area + last area + 4 ? Even area + 2 ? odd areas]
C : [first area + last area + 2 ? Even area + 4 ? odd areas]
D : [first area + last area + 2 ? Even area + 4 ? odd areas].
The order of booking dimensions is
Options
A : Length, breadth, height
B : Breadth, length, height
C : Height, breadth, length
D : None of these.
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
Options
A : 1.80 litres for 5 to 10 users
B : 1.20 litres for 15 users
C : 1.35 for 20 users
D : All the above.
Pick up the correct statement from the following:
Options
A : The bent up bars at a support resist the negative bending moment
B : The bent up bars at a support resist the sharing force
C : The bending of bars near supports is generally at 45°
D : All the above.
The brick work is measured in sq metre, in case of
Options
A : Honey comb brick work
B : Brick flat soling
C : Half brick walls or the partition
D : All the above.
Brick walls are measured in sq. m if the thickness of the wall is
Options
A : 10 cm
B : 15 cm
C : 20 cm
D : None of these.
In case of laying gullies, siphons, intercepting traps, the cost includes
Options
A : Setting and laying
B : Bed concreting
C : Connection to drains
D : All of these.