Pick up the excavation where measurements are made in square metres for payment.

Options

A : Ordinary cuttings up to 1 m

B : surface dressing up to 15 cm depths

C : Surface excavation up to 30 cm depths

D : Both (b) and (c)

View Answer

The expected out turn of 2.5 cm cement concrete floor per manson per day

Options

A : 2.5 sqm

B : 5.0 sqm

C : 7.5 sqm

D : 10 sqm

View Answer

A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.

Options

A : 26, 000 m 3

B : 26, 500 m 3

C : 27, 000 m 3

D : 27, 500 m 3

View Answer

The correct prismoidal formula for volume is

Options

A : D [first area + last area + ? Even area + 2 ? odd areas]

B : [first area + last area + 4 ? Even area + 2 ? odd areas]

C : [first area + last area + 2 ? Even area + 4 ? odd areas]

D : [first area + last area + 2 ? Even area + 4 ? odd areas].

View Answer

The order of booking dimensions is

Options

A : Length, breadth, height

B : Breadth, length, height

C : Height, breadth, length

D : None of these.

View Answer

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

Options

A : 1.80 litres for 5 to 10 users

B : 1.20 litres for 15 users

C : 1.35 for 20 users

D : All the above.

View Answer

Pick up the correct statement from the following:

Options

A : The bent up bars at a support resist the negative bending moment

B : The bent up bars at a support resist the sharing force

C : The bending of bars near supports is generally at 45°

D : All the above.

View Answer

The brick work is measured in sq metre, in case of

Options

A : Honey comb brick work

B : Brick flat soling

C : Half brick walls or the partition

D : All the above.

View Answer

Brick walls are measured in sq. m if the thickness of the wall is

Options

A : 10 cm

B : 15 cm

C : 20 cm

D : None of these.

View Answer

In case of laying gullies, siphons, intercepting traps, the cost includes

Options

A : Setting and laying

B : Bed concreting

C : Connection to drains

D : All of these.

View Answer

Advanced Surveying - Part 1 more Online Exam Quiz

Concrete Technology - Part 1

Construction Management - Part 1

Docks and Harbours - Part 1

Elements of Remote Sensing - Part 1

Engineering Economy - Part 1

GATE Exam Questions - Part 1

Highway Engineering - Part 1

Hydraulics - Part 1

Irrigation - Part 1

Railways - Part 1