Construction Cost Estimation Types Estimates Online Exam Quiz

Construction Cost Estimation Types Estimates GK Quiz. Question and Answers related to Construction Cost Estimation Types Estimates. MCQ (Multiple Choice Questions with answers about Construction Cost Estimation Types Estimates

In the case of works which require some special types of equipment, an amount of ______ percent of the estimated cost is given.

Options

A : 1-2

B : 5-9

C : 12-18

D : 16-20

View Answer

Which of the following data is not required to prepare an estimate?

Options

A : Amplitude

B : Drawings

C : Specifications

D : Rates

View Answer

In the cubical contents method, the cost of a structure is computed by the multiplication of total cubic contents and _______

Options

A : Area of building

B : Volume of building

C : Local cubic rate

D : Length of building

View Answer

Which of the following is not a method used for preparing approximate estimates?

Options

A : Cubical contents method

B : Unit base method

C : Plinth area method

D : Cylindrical base method

View Answer

In the plinth area method, the cost of construction is computed by the multiplication of ________

Options

A : Plinth length and rate

B : Plinth breadth and rate

C : Plinth area and plinth area rate

D : Plinth volume and plinth length rate

View Answer

As per IS 3861-1966, which of the following areas should not be included while calculating the plinth area of a building?

Options

A : Porches of non-cantilever type

B : Area of barsati at terrace level

C : Area of walls at floor level

D : Area of lofts

View Answer

While fixing rate per unit of an item, the quantity of materials and labour needed for one unit of an item are strictly per __________

Options

A : Special Data Book

B : Standard Data Book

C : Special Data Record

D : Specific Data Record

View Answer

Estimating is the technique of calculating the various quantities and is needed for controlling the expenditure during the execution of the work.

Options

A : True

B : False

C :

D :

View Answer

For the preparation of approximate estimates, cubical contents method is more accurate than the unit base method and plinth area method.

Options

A : True

B : False

C :

D :

View Answer

The process of working out the cost per unit of each item is known as _________

Options

A : Work

B : Sheet

C : Data

D : Analysis

View Answer

Building Construction Question Papers more Online Exam Quiz

Computer Organization Questions Bank

Computer Organization Quiz

Computer Organization Test

Construction Building Materials Arches Technical Terms

Construction Cost Estimation Labour Rate Analysis

Construction Cost Estimation Units Dimensions

Construction Materials Aptitude Test

Construction Materials Assessment

Construction Materials Basic

Construction Materials Campus Interviews