Question: The kind of canal section involved in irrigation work is __________
Options
A : canal high in embankment in partly in excavation
B : canal partly in excavation and partly in embankment
C : canal less in embankment
D : canal half in excavation
Civil Engineering Drawing Entrance Exams more questions
Which country invented CANDU heavy water reactor?
The country which imported the largest amount of U.S. ice....
A pipe between surge tank and prime mover is known....
The water from is drawn by the __________
An impermeable layer is provided at the bed and sides....
Low head hydro plant is also known as ____________
A non-structural measure in flood control management is:
Membrane potential and the proton gradient ____________
What is it called when the noise is present in....
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Developing Network
Civil Engineering Drawing Development Surfaces
Civil Engineering Drawing Different Types Estimates
Civil Engineering Drawing Earthwork Concrete R C C Work
Civil Engineering Drawing Earthwork Estimation
Civil Engineering Drawing Estimate Metalled Roads
Civil Engineering Drawing Estimate Singledouble Room Building
Civil Engineering Drawing Estimation R C C Structures