Question: The expected out turn for earth work in excavation in ordinary soil per labourer per day is _____

Options

A : 1 cum

B : 2 cum

C : 3 cum

D : 4 cum

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing Estimate Singledouble Room Building more questions

What should be the least overall average thickness of the....

Mean diameter of coil is 170 mm and spring index....

A rotating phase sequence indicator consists of ________

The moving element of the ohmmeter in a megger consists....

1 Faraday = _______________

The duration of action of parental controlled release systems can....

How early should a calf receive colostrums?

What is the incubation period of Rhabdo virus?

Electron beam is deflected in __________

Every cycle of ?-oxidation produces ____________

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Different Types Estimates

Civil Engineering Drawing Earthwork Concrete R C C Work

Civil Engineering Drawing Earthwork Estimation

Civil Engineering Drawing Entrance Exams

Civil Engineering Drawing Estimate Metalled Roads

Civil Engineering Drawing Estimation R C C Structures

Civil Engineering Drawing Experienced

Civil Engineering Drawing Finishing Work

Civil Engineering Drawing Freshers

Civil Engineering Drawing General Specifications