Civil Engineering Drawing Freshers Online Exam Quiz
Civil Engineering Drawing Freshers GK Quiz. Question and Answers related to Civil Engineering Drawing Freshers. MCQ (Multiple Choice Questions with answers about Civil Engineering Drawing Freshers
In estimated cost what is the value taken for contingencies?
Options
A : 0.5%-2.5%
B : 3%-5%
C : 5%-6%
D : 0%
Multiplying factor for prefix “atto” is _______
Options
A : 10-8
B : 1018
C : 10-18
D : 108
For computing painting estimate for a venetian what times area is considered?
Options
A : 2 times 1 surface area, both sides
B : 1 times 1 surface area,1 side
C : 1 times 1 surface area, for both sides
D : 3 times 1 surface area, both sides
Estimation cost provided for water supply and electrification is __________
Options
A : 4% and 6%
B : 18% and 18%
C : 08% and 08%
D : 12% and 15%
Earthwork in plinth filling is calculated by taking _____________
Options
A : External dimensions b/w plinth walls
B : Vertical dimensions b/w plinth walls
C : Internal dimensions b/w plinth walls
D : Total dimensions b/w plinth walls
Large cornice is measured in ________
Options
A : q ft
B : g ft
C : r ft
D : t ft
No deduction is made for?
Options
A : Rectangular openings >1 sq ft
B : Arch masonary
C : Bed plate upto 4?depth
D : Lintels over openings
In which unit, masonary of thin partition wall is calculated?
Options
A : sq m
B : cu m
C : sq ft
D : sq cm
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Estimate Metalled Roads
Civil Engineering Drawing Estimate Singledouble Room Building
Civil Engineering Drawing Estimation R C C Structures
Civil Engineering Drawing Experienced
Civil Engineering Drawing Finishing Work
Civil Engineering Drawing General Specifications
Civil Engineering Drawing General Specifications Modern Road
Civil Engineering Drawing Geometrical Construction