Question: Normally earthwork is estimated for 30 m lead for distance and 1.5 m lift for height or depth, and this distance of 30 m and the height of 1.5 m are known as _____________

Options

A : vertical lead and lift

B : normal lead and lift

C : horizontal lead and lift

D : transverse lead and lift

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing Test more questions

What is girt?

In the formula Mt=Pt×r, what is Pt?

What are columns?

In what way are all the precipitations measured?

Which of the following gating designs is used to avoid....

A column is _______ member.

A decoder is required in case of a ______________

Planes which are inclined to both the reference planes are....

What type of polarization is used for ground waves?

Which one of the following is not a part of....

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Sanitary Works

Civil Engineering Drawing Scales

Civil Engineering Drawing Sections Solids

Civil Engineering Drawing Steel Iron Work 1

Civil Engineering Drawing Structural Designing Thumb Rules

Civil Engineering Drawing Types Construction Specification

Civil Engineering Drawing Values Tax Funds Rents Etc

Civil Engineering Drawing Water Supply Electrical Road Work

Civil Engineering Drawing Water Supply Works

Civil Engineering Drawing Wells