Question: Normally earthwork is estimated for 30 m lead for distance and 1.5 m lift for height or depth, and this distance of 30 m and the height of 1.5 m are known as _____________
Options
A : vertical lead and lift
B : normal lead and lift
C : horizontal lead and lift
D : transverse lead and lift
Civil Engineering Drawing Test more questions
In the formula Mt=Pt×r, what is Pt?
In what way are all the precipitations measured?
Which of the following gating designs is used to avoid....
A decoder is required in case of a ______________
Planes which are inclined to both the reference planes are....
What type of polarization is used for ground waves?
Which one of the following is not a part of....
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Sanitary Works
Civil Engineering Drawing Scales
Civil Engineering Drawing Sections Solids
Civil Engineering Drawing Steel Iron Work 1
Civil Engineering Drawing Structural Designing Thumb Rules
Civil Engineering Drawing Types Construction Specification
Civil Engineering Drawing Values Tax Funds Rents Etc
Civil Engineering Drawing Water Supply Electrical Road Work