Civil Engineering Drawing Test Online Exam Quiz

Civil Engineering Drawing Test GK Quiz. Question and Answers related to Civil Engineering Drawing Test. MCQ (Multiple Choice Questions with answers about Civil Engineering Drawing Test

Typical lane widths range from ______ metres to _____ metres.

Options

A : 1, 2.4

B : 10, 12.6

C : 3, 3.6

D : 8, 8.6

View Answer

Calculate the quantity of earthwork for 200 m length for a portion of road in an uniform ground the heights of banks at the two ends being 1.00 m and 1.60 m. The formation width is 10 mm and side slope 2:1. Assume that there is no traverse slope.

Options

A : 3276 cu m

B : 5676 cu m

C : 6757 cu m

D : 1121 cu m

View Answer

Workout the quantity of earthwork for an embankment 150 m long and 10 m wide at the top. Slide slop is 2:1 and depths at each 30 m intervals are 1.2, 1.4, 1.4, 1.6, 0.60, 1.6 m.

Options

A : 3572.9 m3

B : 4563.7 m3

C : 2572.8 m3

D : 2590.0 m3

View Answer

The vertical alignment of a road, expressed as a series of grades, connected by parabolic curves is called ___________

Options

A : curb

B : cant

C : profile

D : curve

View Answer

A raised edge at the side of the roadway is known as _____________

Options

A : curb

B : curvature

C : inclination

D : circular

View Answer

To calculate the volume of earthwork from contour plan for filling a depression or pond and for cutting a hillock __________________ may be used conveniently.

Options

A : elevation method

B : section area method

C : prismoidal formula

D : contour method

View Answer

A ________ is a thoroughfare, route, or way on land between two places that has been paved or otherwise improved to allow travel by foot or some form of conveyance, including a motor vehicle, cart, bicycle, or horse.

Options

A : harbour

B : hole

C : lift

D : road

View Answer

What is the longitudinal slope called?

Options

A : Kerb

B : Horizon

C : Grade

D : Lift

View Answer

Cross-section of earthwork of road in banking is in the form of trapezium. Name the method to calculate the quantity of earthwork.

Options

A : Longitudinal formula

B : Quadrilateral formula

C : Prismoidal formula

D : Trapezium formula

View Answer

____________________ is the road alignment specification which provides a substantially clear line of sight so that the driver of a vehicle.

Options

A : Stopping sight distance

B : Safe sight distance

C : Corner sight distance (CSD)

D : Intersection sight distance

View Answer

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Sanitary Works

Civil Engineering Drawing Scales

Civil Engineering Drawing Sections Solids

Civil Engineering Drawing Steel Iron Work 1

Civil Engineering Drawing Structural Designing Thumb Rules

Civil Engineering Drawing Types Construction Specification

Civil Engineering Drawing Values Tax Funds Rents Etc

Civil Engineering Drawing Water Supply Electrical Road Work

Civil Engineering Drawing Water Supply Works

Civil Engineering Drawing Wells