Civil Engineering Drawing Types Construction Specification Online Exam Quiz
Civil Engineering Drawing Types Construction Specification GK Quiz. Question and Answers related to Civil Engineering Drawing Types Construction Specification. MCQ (Multiple Choice Questions with answers about Civil Engineering Drawing Types Construction Specification
Stabilized soil wall is cued for ______ to ______ days by sprinkling water.
Options
A : 3 to 6
B : 15 to 20
C : 7 to 10
D : 20 to 35
The excavation exceeding 1.5 m in width and 10 sq. m in plan area with a depth not exceeding 30 cm, is termed as __________
Options
A : excavation
B : surface dressing
C : surface excavation
D : cutting
The brick work is not measured in cu m in case of __________
Options
A : one or more than one brick wall
B : brick work in arches
C : reinforced brick work
D : half brick wall
The water proof mud- plaster consists of _______________
Options
A : soil
B : janta Emulsion
C : cowdung
D : soil, janta emulsion and cowdung
Average number of blocks required for a two-roomed house is about 2500.
Options
A : True
B : False
C :
D :
For making bund ordinary mud wall gonda ( bund) about 8” * 6” shall be made on the sides.
Options
A : True
B : False
C :
D :
For preparation of subgrade the existing subgrade should be dressed to a camber of 1 in 24 to 1 in 32.
Options
A : True
B : False
C :
D :
Before applying water proof mud plaster, the joints should not be scrapped.
Options
A : True
B : False
C :
D :
The roofing cannot be made with slate.
Options
A : True
B : False
C :
D :
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Scales
Civil Engineering Drawing Sections Solids
Civil Engineering Drawing Steel Iron Work 1
Civil Engineering Drawing Structural Designing Thumb Rules
Civil Engineering Drawing Test
Civil Engineering Drawing Values Tax Funds Rents Etc
Civil Engineering Drawing Water Supply Electrical Road Work
Civil Engineering Drawing Water Supply Works