Question: In water bound macadam roads, binding material is Brick dust.
Options
A : True
B : False
C :
D :
Previous ||
Civil Engineering Drawing Entrance Exams more questions
In Upstream processes, process development increases the mRNA hydrolysis and....
In vacuum degassing method, low viscosity is considered to have....
In vacuum die casting, the melt enters into the mould....
In vacuum die casting, the molten metal enters into the....
In vitro determination of bioavailability by dissolution rate is not....
In waterfall method of glazing, glaze is fed through rotating....
In winter, much more radiation falls on the horizontal surface....
In working at the foundry, the risk of getting injuries....
In your Linux-based system, you have to log-in with your....
Incidence matrix and Adjacency matrix of a graph will always....
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Developing Network
Civil Engineering Drawing Development Surfaces
Civil Engineering Drawing Different Types Estimates
Civil Engineering Drawing Earthwork Concrete R C C Work
Civil Engineering Drawing Earthwork Estimation
Civil Engineering Drawing Estimate Metalled Roads
Civil Engineering Drawing Estimate Singledouble Room Building
Civil Engineering Drawing Estimation R C C Structures