Question: In water bound macadam roads, binding material is Brick dust.

Options

A : True

B : False

C :

D :

Click to view Correct Answer

Previous ||

Civil Engineering Drawing Entrance Exams more questions

In Upstream processes, process development increases the mRNA hydrolysis and....

In vacuum degassing method, low viscosity is considered to have....

In vacuum die casting, the melt enters into the mould....

In vacuum die casting, the molten metal enters into the....

In vitro determination of bioavailability by dissolution rate is not....

In waterfall method of glazing, glaze is fed through rotating....

In winter, much more radiation falls on the horizontal surface....

In working at the foundry, the risk of getting injuries....

In your Linux-based system, you have to log-in with your....

Incidence matrix and Adjacency matrix of a graph will always....

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Developing Network

Civil Engineering Drawing Development Surfaces

Civil Engineering Drawing Different Types Estimates

Civil Engineering Drawing Earthwork Concrete R C C Work

Civil Engineering Drawing Earthwork Estimation

Civil Engineering Drawing Estimate Metalled Roads

Civil Engineering Drawing Estimate Singledouble Room Building

Civil Engineering Drawing Estimation R C C Structures

Civil Engineering Drawing Experienced

Civil Engineering Drawing Finishing Work