Question: First coat of bituminous painting shall be with stone ballast no.3 and stone grit of 20 mm gauge at 220 kg of asphalt and 1.35 cu m of stone grit per 100 sq. m.

Options

A : True

B : False

C :

D :

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing General Specifications Modern Road more questions

Fillers are added to reduce water penetration into paper products.

Find the solution of x2? 15 mod 23 has a....

Find the solution of x2? 2 mod 11 has a....

Finishing allowance to a pattern is generally provided to avoid....

Fire clay bricks are made by burning them at high....

First order derivative can enhance the fine detail in the....

Five types of metal floats are usually used for good....

Flame or arc cutting method is used for the removal....

Flemish bond is expensive than English bond.

Flexible pavements are generally used in constructing airports and major....

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Estimation R C C Structures

Civil Engineering Drawing Experienced

Civil Engineering Drawing Finishing Work

Civil Engineering Drawing Freshers

Civil Engineering Drawing General Specifications

Civil Engineering Drawing Geometrical Construction

Civil Engineering Drawing House Design General Arrangement

Civil Engineering Drawing Industrial Planning

Civil Engineering Drawing Intersection Surfaces

Civil Engineering Drawing Interview