Question: As soon as sufficient length of premix has been laid, rolling should be started with 2 to 4 tonne roller.

Options

A : True

B : False

C :

D :

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing General Specifications Modern Road more questions

Aromatic hydrocarbons are readily miscible in water and immiscible with....

Around 30% of wastewater produced globally remains untreated, causing widespread....

As a modern technique use of plastics in canal lining....

As Human and Drosophila both follow XY system of sex....

As M is increased, W(?) becomes wider and the smoothening....

As the optical activity changes with the wavelength of light,....

As the solidification progresses gradually inwards, small crystals with systematic....

Asbestos cement sheets are stronger than G.I. sheets.

Asbestos is used in reinforcing fibre.

Asbestos sheet partitions are weak and heavy.

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Estimation R C C Structures

Civil Engineering Drawing Experienced

Civil Engineering Drawing Finishing Work

Civil Engineering Drawing Freshers

Civil Engineering Drawing General Specifications

Civil Engineering Drawing Geometrical Construction

Civil Engineering Drawing House Design General Arrangement

Civil Engineering Drawing Industrial Planning

Civil Engineering Drawing Intersection Surfaces

Civil Engineering Drawing Interview