Question: During lime concreting in foundation the concrete shall consists of 10 cu m of brick ballast, 0.92 cu m of surkhi and 0.6 cu m of white lime in the proportion of 100:32:16 by volume.

Options

A : True

B : False

C :

D :

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing Detailed Specifications more questions

Due to mould oscillation to minimize friction, oscillation marks formed....

Due to the presence of ejector die, there is no....

Dumping of sewage sludge into the sea is preferred and....

Duration of light period is more important than the duration....

During lime concreting in foundation if kankar lime is used....

During oxidation within a cell, all the energy is released....

During the construction of earthquake-resistant buildings, ceiling plaster should be....

During the solidification of casting in an insulating mould, the....

During trace time, voltage is decreasing with time.

During translation RF1 recognizes the stop codon UGA and translation....

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Culverts

Civil Engineering Drawing Curves Used Engineering Practice

Civil Engineering Drawing Dealing Railways

Civil Engineering Drawing Design Road Pavement

Civil Engineering Drawing Design Septic Tanks

Civil Engineering Drawing Detailed Specifications Road Work 1

Civil Engineering Drawing Developing Network

Civil Engineering Drawing Development Surfaces

Civil Engineering Drawing Different Types Estimates

Civil Engineering Drawing Earthwork Concrete R C C Work