Question: As a very general guideline it is recommended that the bottom of the pit should be at least _______ above groundwater level.
Options
A : 0.5 m
B : 2 m
C : 12 m
D : 20 m
Civil Engineering Drawing Design Septic Tanks more questions
A barometer has liquid level 10 cm above the outside....
The speed of P-waves in granite is ________
Find the area of permanent land required for a State....
A reactor with efficiency 50%, has the feed CO2 and....
What is the minimum imposed load on roof trusses as....
What should be the minimum distance maintained when performing an....
Clean air should contain less than __________ of suspended impurity....
A piston cylinder contracts from 10 Liter to 5 Liter....
What is the thickness of the most commonly used grade....
What is the amount of clearance allowed between the slits....
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Contract System
Civil Engineering Drawing Culverts
Civil Engineering Drawing Curves Used Engineering Practice
Civil Engineering Drawing Dealing Railways
Civil Engineering Drawing Design Road Pavement
Civil Engineering Drawing Detailed Specifications
Civil Engineering Drawing Detailed Specifications Road Work 1
Civil Engineering Drawing Developing Network