Question: The difference in level between the top of a bank and supply level in a canal, is called

Options

A : berm

B : free board

C : height of bank

D : none of these.

Click to view Correct Answer

Previous || Next

Irrigation - Part 1 more questions

Highest dam in India, is

Borrow pits should preferably be located in

Irrigation canals are generally aligned along

The length of a meander is the distance along the....

Pick up the incorrect statement from the following

F.S.L. of a canal at its head with respect to....

The measure to remove water logging of land, is

Attracting groynes are built

Retrogression of the bed level of a river downstream a....

In a canal syphon, the flow is

Advanced Surveying - Part 1 more Online Exam Quiz

Engineering Economy - Part 1

Estimating and Costing - Part 1

GATE Exam Questions - Part 1

Highway Engineering - Part 1

Hydraulics - Part 1

Railways - Part 1

RCC Structures Design - Part 1

SI Units - Part 1

Soil Mechanics and Foundation Engineering - Part 1

Steel Structure Design - Part 1