Question: For constructing a terrazo floor. Pick up the incorrect statement from the following :

Options

A : a base course is prepared as in cement concrete flooring

B : a 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling

C : glass strips are driven into the layer according to the pattern required

D : after final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material

Click to view Correct Answer

Previous || Next

Building Construction - Part 1 more questions

The member which is placed horizontally to support common rafter....

Pick up the correct statement from the following:

The exterior angle between outer faces of a wall, is....

In jack arch floor, the rise is kept

While designing a stair, the product of rise and going....

The entrained concrete is used in lining walls and roofs....

The pile which is provided with a bulb filled with....

In case of multi-storeyed buildings, the forms to be removed....

For providing a raft foundation, the following activities are involved

The maximum permissible deflection of a timber beam supporting a....

Advanced Surveying - Part 1 more Online Exam Quiz

Refractory Technology - Part 1

Stoichiometry - Part 1

Advanced Surveying - Part 1

Airport Engineering - Part 1

Applied Mechanics - Part 1

Building Materials - Part 1

Concrete Technology - Part 1

Construction Management - Part 1

Docks and Harbours - Part 1

Elements of Remote Sensing - Part 1