Question: Pick up the incorrect statement from the following:
Options
A : Channelization of pavement is caused by constant use of tri-cycle gears of aircraft
B : Blast pads are used over cohesionless soils to resist erosion due to tremendous speed of the jet blast
C : Over-run areas of at least 300 m length on either side of the runway are provided
D : None of these.
Airport Engineering - Part 1 more questions
The thickness design of the pavement, is decided on the....
For Class A Air port the difference of reduced levels....
Beaufort scale is used to determine
The distance between main gears is 10 m, and the....
From the end of an instrumental runway, the approach surface....
The coordinates of the ends of a runway are (5000,....
A gradient of + 0.08% is followed by a gradient....
The bearing of the runway at threshold is 290°, the....
The best direction of a runway is along the direction....
Advanced Surveying - Part 1 more Online Exam Quiz
Process Control and Instrumentation - Part 1
Process Equipment and Plant Design - Part 1
Refractory Technology - Part 1