Question: Works like earthwork and cement concrete are measured in ________

Options

A : Square metres

B : Metres

C : Litres

D : Cubic metres

Click to view Correct Answer

Previous || Next

Construction Cost Estimation Units Dimensions more questions

The front view obtained on the development of a square....

The cross-section perpendicular to the base but not through the....

The output current waveform for R load in CSI is....

What type of waveform must be transmitted to reduce Doppler....

_______are usually utilized to extract heat from a variety of....

According to tanks in series model, the spread of the....

In a moving iron meter, the deflection torque is proportional....

The rate at which monolithic devices transfer drugs to the....

The torque in an induction motor varies as ______ and....

What is the geometry of pentacarbonyliron(0)?

Building Construction Question Papers more Online Exam Quiz

Computer Organization Quiz

Computer Organization Test

Construction Building Materials Arches Technical Terms

Construction Cost Estimation Labour Rate Analysis

Construction Cost Estimation Types Estimates

Construction Materials Aptitude Test

Construction Materials Assessment

Construction Materials Basic

Construction Materials Campus Interviews

Construction Materials Curved Roofs