Question: The adequate workability necessary for _________ compaction with the compacting equipment available.

Options

A : Half

B : Quarter

C : Full

D : Double

Click to view Correct Answer

Previous || Next

Concrete Technology Concept Concrete Mix Design more questions

At constant temperature the pressure of an ideal gas is....

If the velocity of the block is doubled, the kinetic....

In a brick cavity wall, the inner and outer leaf....

Plain brick partitions are ______ brick thick.

For a change in temperature ______ is added to tn.

The adequate workability necessary for ___________ compaction with the compacting....

A view is selected by specifying a sub-area of the....

The output of a full subtractor is same as ____________

The difference between half adder and full adder is __________

To save space on the drawing or to save time....

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Concrete Technology Bulking Aggregates

Concrete Technology Campus Interviews

Concrete Technology Chemical Composition Test

Concrete Technology Classification Aggregates

Concrete Technology Compression Test

Concrete Technology Concrete Repair System

Concrete Technology Creep

Concrete Technology Curing Fresh Concrete

Concrete Technology Damp Proofing Admixtures

Concrete Technology Destructive Non Destructive Tests