Question: The adequate workability necessary for _________ compaction with the compacting equipment available.
Options
A : Half
B : Quarter
C : Full
D : Double
Concrete Technology Concept Concrete Mix Design more questions
At constant temperature the pressure of an ideal gas is....
If the velocity of the block is doubled, the kinetic....
In a brick cavity wall, the inner and outer leaf....
Plain brick partitions are ______ brick thick.
For a change in temperature ______ is added to tn.
The adequate workability necessary for ___________ compaction with the compacting....
A view is selected by specifying a sub-area of the....
The output of a full subtractor is same as ____________
The difference between half adder and full adder is __________
To save space on the drawing or to save time....
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Concrete Technology Bulking Aggregates
Concrete Technology Campus Interviews
Concrete Technology Chemical Composition Test
Concrete Technology Classification Aggregates
Concrete Technology Compression Test
Concrete Technology Concrete Repair System
Concrete Technology Curing Fresh Concrete