Question: Calculate the number of cement bags required for RCC (1:2:4) for 15 m3 of work.
Options
A : 24.6
B : 38.9
C : 56.7
D : 93.8
Construction Cost Estimation Labour Rate Analysis more questions
What is the maximum area of the rectangle with perimeter....
The mole percent of CO2 and H2O in a mixture....
India’s total primary energy consumption is ____________
The true length of the line is 30 cm and....
The length in isometric drawing of line is 20 cm.....
Calculate the active power in a 788 ? resistor with....
What will be the optimum pouring time for cast iron....
The normal red cell lasts approximately how many days before....
What should be the minimum amount of current that has....
Cyclohexane having CP = 48 J/oC, is heated from 50oC....
Building Construction Question Papers more Online Exam Quiz
Computer Organization Questions And Answers Interface Circuits
Computer Organization Questions Bank
Construction Building Materials Arches Technical Terms
Construction Cost Estimation Types Estimates
Construction Cost Estimation Units Dimensions
Construction Materials Aptitude Test