Question: The following steps are involved in laying a sewer in a trench : 1. Transferring the center line of the sewer to the bottom trench. 2. Setting sight rails over the trench. 3. Driving pegs to the level of the invert line of the sewer. 4. Placing the sewer of these steps is The correct sequence of these steps is

Options

A : 1, 2, 3, 4

B : 2, 3, 4, 1

C : 4, 2, 3, 1

D : 2, 3, 1, 4

Click to view Correct Answer

Previous || Next

UPSC Civil Service Exam Questions - Part 1 more questions

An overhead track on a large truss frame is required....

In the given figure drill holes, heading, mucking and benching....

The length of the needle beam used in needle beam....

High pressure grouting is generally restored for concreting in the....

Which type of light energy is effectively absorbed by CO....

A horizontal rod AB carries three loads of 3.0 kg,....

Distemper is used to coat

A soil has a liquid limit of 45% and lies....

A high efficiency pump is required for low discharge, high....

For total reaction time of 2.5 seconds, coefficient of friction....

Advanced Surveying - Part 1 more Online Exam Quiz

Strength of Materials - Part 1

Structural Design Specifications - Part 1

Surveying - Part 1

Theory of Structures - Part 1

Tunnelling - Part 1

Waste Water Engineering - Part 1

Water Resources Engineering - Part 1

Water Supply Engineering - Part 1

Artificial Intelligence - Part 1

Automation System - Part 1