Question: An overhead track on a large truss frame is required in case of car changer by

Options

A : the grass hopper method

B : the passing track method

C : California crossing method

D : Dixon conveyor method.

Click to view Correct Answer

Previous || Next

Tunnelling - Part 1 more questions

Railway tunnels, are generally

Pick up the explosive used for tunnelling in soft rocks....

The cut of a tunnel face is shown in given....

For B.G. single track, the section of the tunnel must....

Which one of the following methods is generally adopted for....

In the given figure drill holes, heading, mucking and benching....

The length of the needle beam used in needle beam....

High pressure grouting is generally restored for concreting in the....

Which type of light energy is effectively absorbed by CO....

The following steps are involved in laying a sewer in....

Advanced Surveying - Part 1 more Online Exam Quiz

Steel Structure Design - Part 1

Strength of Materials - Part 1

Structural Design Specifications - Part 1

Surveying - Part 1

Theory of Structures - Part 1

UPSC Civil Service Exam Questions - Part 1

Waste Water Engineering - Part 1

Water Resources Engineering - Part 1

Water Supply Engineering - Part 1

Artificial Intelligence - Part 1