Digital System Projects Using HDL - General Questions Online Exam Quiz

Digital System Projects Using HDL - General Questions GK Quiz. Question and Answers related to Digital System Projects Using HDL - General Questions. MCQ (Multiple Choice Questions with answers about Digital System Projects Using HDL - General Questions

In a frequency counter, what happens at high frequencies when the sampling interval is too long?

Options

A : The counter works fine.

B : The counter undercounts the frequency.

C : The measurement is less precise.

D : The counter overflows.

View Answer

In the digital clock project, when does the PM indicator go high?

Options

A : Never

B : Going from 11:59:59 to 12:00:00

C : Going from 12:59:59 to 01:00:00

D : On the falling edge of the clock after enable goes high

View Answer

How is the output frequency related to the sampling interval of a frequency counter?

Options

A : Directly with the sampling interval

B : Inversely with the sampling interval

C : More precision with longer sampling interval

D : Less precision with longer sampling interval

View Answer

In an HDL application of a stepper motor, after an up/down counter is built what is done next?

Options

A : Build the sequencer

B : Test it on a simulator

C : Test the decoder

D : Design an intermediate integer variable

View Answer

In a digital clock application, the basic frequency must be divided down to:

Options

A : 1 Hz.

B : 60 Hz.

C : 100 Hz.

D : 1000 Hz.

View Answer

In the keypad application, what does the data signal define?

Options

A : The row and column encoded data

B : The ring encoded data

C : The freeze locator data

D : The ring counter data

View Answer

What does the ring counter in the HDL keypad application do when a key is pressed?

Options

A : Count to find the row

B : Freeze

C : Count to find the column

D : Start the D flip-flop

View Answer

In the digital clock project, the purpose of the frequency prescaler is to:

Options

A : find the basic frequency.

B : transform a 60 pps input to a 1 pps timing signal.

C : prevent the clock from exceeding 12:59:59.

D : allow the BCD display to have a value from 00–59.

View Answer

Which is not a step that should be followed in project management?

Options

A : Overall definition

B : System documentation

C : Synthesis and testing

D : System integration

View Answer

In the keypad application, what does the preset state of the ring counter define?

Options

A : The proper output of the column encoder

B : The NANDing of the rows

C : The NANDing of the columns

D : The proper output of the row encoder

View Answer

Boolean Algebra and Logic Simplification - General Questions more Online Exam Quiz

Describing Logic Circuits - General Questions

Digital Arithmetic Operations and Circuits - General Questions

Digital Concepts - General Questions

Digital Design - General Questions

Digital Signal Processing - General Questions

Flip-Flops - General Questions

Integrated-Circuit Logic Families - General Questions

Integrated Circuit Technologies - General Questions

Interfacing to the Analog World - General Questions