An Executive Engineer of roads, executes works under direct control of ___

Options

A : Superintending Engineer

B : Secretary to the Govt

C : Chief Engineer

D : Junior engineer

View Answer

Enoscope is used to determine ___

Options

A : spot speed

B : average speed

C : travel time

D : average time

View Answer

How many types of protocols are important for instant messaging?

Options

A : 2

B : 3

C : 4

D : All of the mentioned

View Answer

In ideal pavement is constructed with ___

Options

A : bricks

B : hard soil

C : portland cement concrete

D : tar

View Answer

The absolute minimum sight distance required for stopping a vehicle moving with a speed of 80 km ph, is __

Options

A : 100 cm

B : 120 cm

C : 40 cm

D : 60 cm

View Answer

The head of public works department of any Indian state, is __

Options

A : Transport Minister

B : Chief Engineer

C : Superintending Engineer

D : Executive Engineer

View Answer

Which of the following protocol is adopted for interoperability by top three IM service providers?

Options

A : SIP

B : SIMPLE

C : XMPP

D : IMPS

View Answer

Which of the following protocol is not an Internet Engineering Task Force standard?

Options

A : SIP

B : SIMPLE

C : XMPP

D : IMPS

View Answer

Detailed Specifications of Road Work - 2 more Online Exam Quiz

Riser Design - 2

Cell Signaling and Signal Transduction - Protein-tyrosine Phosphorylation

Energy Balances Application in Processes

Real gas Mixture

Synthetic Organic Chemical - Bhc

Communicating with the Cloud - 2

Next Generation Wireless Network - Spectrum Awareness - 2

Diffusion Problem - Least-Square Gradient for Cartesian Grids

The Internet and its Services

Factors Affecting PIC, Cold Weather Concreting