Question: While preparing whitewash, up to how many grams of ultra-marine blue is added per kg of lime?

Options

A : 3 gm

B : 30 gm

C : 200 gm

D : 300 gm

Click to view Correct Answer

Previous || Next

Building Construction White Washing Color Washing more questions

What is the dimension of the round copper wire made....

3 bits full adder contains ________

3 bits full adder contains ____________

A single-pole model has __________ db/decade roll-off of the gain.

Which short of instrument is shown below?

Feed of a reactor has 0.25 mass fraction of H2O....

The feed of a process simulator is 15 J, the....

For an ideal gas isobaric process what is the work....

A mixture contains 20% O2 with CP = 15 J/oC....

A speech signal occupying the bandwidth of 300 Hz to....

Building Construction Aptitude Test more Online Exam Quiz

Building Construction Types Roofs

Building Construction Types Stairs

Building Construction Types Upper Floors 1

Building Construction Types Walls

Building Construction Water Distribution System 1

Building Construction Written Test

Building Materials Climate Effects

Building Materials Defects Auditorium

Building Materials Experienced

Building Materials Fixtures Fastenings 1