Question: Which type of estimate is prepared by calculating building area and then multiplying area by predefined unit cost?

Options

A : Unit Based Estimate

B : Model estimate

C : Project Comparison Estimate

D : Parametric estimate

Click to view Correct Answer

Previous ||

Civil Engineering Drawing Line Planned Storeyed Buildings more questions

When the data at a location in cache is different....

What MySQL property is used to create a surrogate key....

How does mode S identify each aircraft?

Determine all possibilities for the number of solutions of the....

URL stands for ________

Which of the following is regarded as the ‘repeatable entity’....

A memory is a collection of ____________

Extraction comes under which of the mentioned?

Combustion falls under which of the below mentioned?

Drying can be characterized as which of the mentioned?

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Interview Experienced

Civil Engineering Drawing Interview Freshers

Civil Engineering Drawing Isometric Projection

Civil Engineering Drawing Jack Arched Flat Terraced Roof

Civil Engineering Drawing Labour Rates Workers

Civil Engineering Drawing Lines Lettering Dimensioning

Civil Engineering Drawing Loci Points

Civil Engineering Drawing Madras Terraced Sloping Roof

Civil Engineering Drawing Masonry Platformwater Tankmotor Garage

Civil Engineering Drawing Mcqs