Question: Which type of estimate is prepared by calculating building area and then multiplying area by predefined unit cost?
Options
A : Unit Based Estimate
B : Model estimate
C : Project Comparison Estimate
D : Parametric estimate
Previous ||
Civil Engineering Drawing Line Planned Storeyed Buildings more questions
When the data at a location in cache is different....
What MySQL property is used to create a surrogate key....
How does mode S identify each aircraft?
Determine all possibilities for the number of solutions of the....
Which of the following is regarded as the ‘repeatable entity’....
A memory is a collection of ____________
Extraction comes under which of the mentioned?
Combustion falls under which of the below mentioned?
Drying can be characterized as which of the mentioned?
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Interview Experienced
Civil Engineering Drawing Interview Freshers
Civil Engineering Drawing Isometric Projection
Civil Engineering Drawing Jack Arched Flat Terraced Roof
Civil Engineering Drawing Labour Rates Workers
Civil Engineering Drawing Lines Lettering Dimensioning
Civil Engineering Drawing Loci Points
Civil Engineering Drawing Madras Terraced Sloping Roof
Civil Engineering Drawing Masonry Platformwater Tankmotor Garage