Question: Which of the following pairs is matched properly?

Options

A : Class A – Concrete work

B : Class B – Mortar

C : Class C – Masonry work

D : Class D – White washing

Click to view Correct Answer

Previous || Next

Basic Civil Engineering Multiple Choice more questions

The push-pull circuit must use ________ operation.

Which generates high distortion?

Which has the maximum power efficiency?

Which of the power amplifiers is not suitable as audio....

Which type of amplifier uses pulse (digital) signals in its....

You have an IP address of 172.16.13.5 with a 255.255.255.128....

Which of the power amplifiers has the lowest overall efficiency?

What is meant by container ship?

_______ is part of user documentation.

Which of this is not a class of IP address?

Basic Civil Engineering more Online Exam Quiz

Basic Civil Engineering Manufacture Tiles

Basic Civil Engineering Manufacture Timber

Basic Civil Engineering Mcqs

Basic Civil Engineering Methods Levelling

Basic Civil Engineering Mortar

Basic Civil Engineering Online Quiz

Basic Civil Engineering Online Test

Basic Civil Engineering Painting

Basic Civil Engineering Plane Table Surveying

Basic Civil Engineering Plastering