Question: Which among the following terms should replace the labels ‘A’ and ‘B’ in the diagram?

Options

A : A – Link layer delay, B – Scheduling Information

B : A – Link layer establishment, B – Spectrum broker

C : A – Scheduling information, B – Link layer delay

D : A – Spectrum broker, B – Link layer establishment

Click to view Correct Answer

Next

Cognitive Radio Next Generation Wireless Network Spectrum Management 1 more questions

Which vitamin can be obtained from sunlight?

Which of the following vitamin is responsible for Ca+2 and....

Which letter is used to designate the immigration?

What is the one letter code for asparagine?

Which letter is used to designate the carrying capacity of....

Identify A and B from the below figure.

Which mode is used for cardiac imaging?

Which among the following terms should replace the labels ‘A’,....

Modulus for float could be achieved by?

Which of the following is an invalid assignment operator?

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Cognitive Radio Next Generation Wireless Network Knowledge Representation

Cognitive Radio Next Generation Wireless Network Network Cognitive Techniques

Cognitive Radio Next Generation Wireless Network Position Awareness 1

Cognitive Radio Next Generation Wireless Network Radio Environment Map 1

Cognitive Radio Next Generation Wireless Network Spectrum Awareness 1

Cognitive Radio Next Generation Wireless Network Spectrum Mobility 1

Cognitive Radio Next Generation Wireless Network Spectrum Sensing 1

Cognitive Radio Next Generation Wireless Network Spectrum Sharing 1

Cognitive Radio Next Generation Wireless Network Upper Layers Issue 1

Cognitive Radio Next Generation Wireless Network User Cognitive Techniques 1