Question: What is the relationship between the priority of task and their period in RMS?

Options

A : decreases

B : increases

C : remains unchanged

D : linear

Click to view Correct Answer

Previous || Next

Embedded Systems Periodic Scheduling more questions

When the regulation by a Zener diode is with a....

For a single phase, 50 Hz transformer, if the open....

Increase in pressure during catalytic cracking process ____________ octane number.

Increasing the stator poles ___________ the speed of Reluctance motor.

On increasing the temperature, the viscosity of the fluid __________

With an accumulation of waste formed during the reaction, the....

As the synchronization levels increases, cost

How is the transformation ratio dependent on the secondary burden?

If stages are fixed, then Reflux ratio

There is an increase in temperature of an object then....

Embedded Systems 8 Bit Accumulator more Online Exam Quiz

Embedded Systems Multitasking Operating System

Embedded Systems Online Quiz

Embedded Systems Online Test

Embedded Systems Operating System

Embedded Systems Parallel Ports

Embedded Systems Power Controls

Embedded Systems Prediction Execution Times

Embedded Systems Priority Inversion

Embedded Systems Processor Embedded System

Embedded Systems Questions Bank