Question: Unit of payment in MKS is of supply of bricks is ______________

Options

A : %nos

B : %cu ft

C : per % nos

D : % r ft

Click to view Correct Answer

Next

Civil Engineering Drawing Interview Freshers more questions

Which of the following measurement defines measurement as a percentage?

If the Y is the reading of sand surface (ml)....

The syntax of printf() function is printf(“control string”, variable list)....

Which of the following format specifiers is used to represent....

Which of the following format specifiers is used to represent....

Which of the following format specifiers is used to specify....

What is the format identifier for “static a = 20.5;”?

Which of the following is the relation between percent strength....

Which reference modifier is used to define the reference variable?

Which among the following has the highest precedence?

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing House Design General Arrangement

Civil Engineering Drawing Industrial Planning

Civil Engineering Drawing Intersection Surfaces

Civil Engineering Drawing Interview

Civil Engineering Drawing Interview Experienced

Civil Engineering Drawing Isometric Projection

Civil Engineering Drawing Jack Arched Flat Terraced Roof

Civil Engineering Drawing Labour Rates Workers

Civil Engineering Drawing Line Planned Storeyed Buildings

Civil Engineering Drawing Lines Lettering Dimensioning