Question: The total project cost consists of two components namely front cost and indirect cost.

Options

A : True

B : False

C :

D :

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing Office Shop Building more questions

The thermo-plastic glues are permanent once they are set.

The tides are rhythmic and constant.

The time varying electric field E is conservative. State True/False.

The toco-transducers are temperature sensitive.

The total body water volume can be determined by using....

The track modulus is not affected by gauges.

The transcriptional state of a cell is irreversible.

The transducer required for recording these movements in apexcardiograph is....

The translocation of mineral elements through the phloem is observed....

The transmitted and received power is the same in a....

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Measurement Calculation Quantities

Civil Engineering Drawing Mixed Masonry

Civil Engineering Drawing Multiple Choice

Civil Engineering Drawing Nomography

Civil Engineering Drawing Oblique Projection

Civil Engineering Drawing Online Quiz

Civil Engineering Drawing Online Test

Civil Engineering Drawing Orientation Building House Planning

Civil Engineering Drawing Orthographic Reading

Civil Engineering Drawing Orthographic Reading Conversion Views