Question: The expected out turn of cement concrete for 1 : 2 : 4 per mason per day is 5.

Options

A : True

B : False

C :

D :

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing Labour Rates Workers more questions

The entrapment of gas is negligible in the squeeze casting....

The error between the desired output and actual output is....

The error constants described are the ability to reduce the....

The evolute of the involute of a circle is the....

The excellent corrosion resistance of high-silicon irons is due to....

The expression of telomerase on cancer cells can be considered....

The extent of drug-protein binding can change with both changes....

The eyes in the potato are the nodes in the....

The FASTA format is readily converted into other formats and....

The faster growing end of the microfilament is the plus-end.

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Interview

Civil Engineering Drawing Interview Experienced

Civil Engineering Drawing Interview Freshers

Civil Engineering Drawing Isometric Projection

Civil Engineering Drawing Jack Arched Flat Terraced Roof

Civil Engineering Drawing Line Planned Storeyed Buildings

Civil Engineering Drawing Lines Lettering Dimensioning

Civil Engineering Drawing Loci Points

Civil Engineering Drawing Madras Terraced Sloping Roof

Civil Engineering Drawing Masonry Platformwater Tankmotor Garage