Question: ___________ of building is the useful area or liveable area or lettable area. This is the total floor area minus the circulation area, verandahs, corridors, passages, staircase, lifts, entrance hall, etc. minus other non-useable areas.
Options
A : Plinth area
B : Floor area
C : Carpet area
D : Circulation area
Civil Engineering Drawing Basic more questions
What is the full form of PPLO?
The ____________ provides support to the occupants, furniture, fixtures and....
Floor under the flooring is called:
The part of a building constructed below ground level is....
_________ is known as Substructure of the building.
The part of the building above the ground level and....
The portion below the plinth level is known as ____________
In the plinth area method, the cost of construction is....
The very First step of McCabe method is?
What does the Ellingham diagram consist of?
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Analysis Rate Road Work
Civil Engineering Drawing Aptitude Test
Civil Engineering Drawing Arch Masonry Calculation
Civil Engineering Drawing Arrangements Rooms Position Purposes
Civil Engineering Drawing Assessment
Civil Engineering Drawing Brickwork Woodwork Stone Masonry
Civil Engineering Drawing Building Bye Laws
Civil Engineering Drawing Campus Interviews
Civil Engineering Drawing Classification Timber Carpenters Work