Question: ________ is applied to the process of laying down certain lines and marks on the ground before the excavation of foundation trenches.

Options

A : Ground tracing

B : Surveying

C : Dumpy level

D : Digging

Click to view Correct Answer

Previous || Next

Building Materials Foundation more questions

The velocity at which yawing motion can be produced by....

The energy level with lower energy is called __________

Which of the following is not a satellite subsystem?

Which type of floor is used for residential buildings?

SHF Em waves are used in?

It is found that the ________ does not lead to....

The example of brackish water is ___________

The ratio of the total floor area inclusive of all....

What is the terminology used to represent the absence of....

Which of the following type is not used in an....

Building Construction Interview Freshers more Online Exam Quiz

Building Construction Written Test

Building Materials Climate Effects

Building Materials Defects Auditorium

Building Materials Experienced

Building Materials Fixtures Fastenings 1

Building Materials Freshers

Building Materials Interview

Building Materials Interview Experienced

Building Materials Interview Freshers

Building Materials Materials Lintels