Question: In mud-phuska terracing with tile paving, bitumen is spread over the R.C.C. slabs at the rate of ________ of bitumen per m2 of the roof surface.
Options
A : 0.7 kg
B : 1.7 kg
C : 2.7 kg
D : 3.7 kg
Building Construction Flat Terraced Roofing more questions
What is the velocity factor of a coaxial cable having....
Find the transmission coefficient of a 75 ohm line with....
For an ideal gas isothermal process what is the work....
What is the pole arc/pitch ratio, if 360 AT compensating....
What is the value of the alternative core lengths below....
A 100mv, 5mA d’Arsonval movement is to be used in....
What is the gap between the free ends of the....
The specific gravity of milk fat at 21°C is?
What is the range of the winding factor for the....
Find the ratio of refractive index of medium 2 to....
Building Construction Aptitude Test more Online Exam Quiz
Building Construction Effective Length Thickness Wall
Building Construction Entrance Exams
Building Construction Experienced
Building Construction Ferrous Metals 1
Building Construction Freshers
Building Construction Functional Requirements Ventilation System