Question: In ____________ method, the freezing pipes are driven below the existing footing and the soil is frozen.

Options

A : Vibroflotation

B : Cement grouting

C : Chemical consolidation

D : Freezing

Click to view Correct Answer

Previous || Next

Construction Building Materials Underpinning Types more questions

What is the frequency used by the glide slope transmitter?

What is the heat generated in eddy current operations?

For the following circuit power is given by

What is the full form of VRA?

Which of these is not a basic shape of bacteria?

_________ method is useful when the soil consists of sand....

__________ method is used to restore slab or pavement which....

Standard consistency of cement is tested by ___________

Which apparatus is generally used to measure the soundness of....

Workability of concrete is measured by __________

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Construction Building Materials Tools Used Stone Masonry

Construction Building Materials Types Drills

Construction Building Materials Types Footing

Construction Building Materials Types Foundation

Construction Building Materials Types Ventilation

Construction Building Materials Well Point System

Corrosion Engineering Aptitude Test

Corrosion Engineering Assessment

Corrosion Engineering Basic

Corrosion Engineering Campus Interviews