Question: In brick-backed stone slab facing, it is advisable to use steel cramps for connecting the facing and backing.
Options
A : True
B : False
C :
D :
Previous ||
Building Construction Brick Stone Composite Masonry more questions
In Aloha technique, the re-transmission takes place immediately.
In an OCC at If =0, graph starts from origin.
In any condition, the effects of superheat cannot be considered....
In bacteria, transcription is initiated by DNA polymerase.
In binary signed representation if most significant bit is one....
In CAD, objects are displayed in block format.
In case of both nitrogen and sulphur existence, Prussian blue....
In cell membrane the hydrocarbon chains for hydrophilic phase and....
In centrifugal casting, only sand moulds can be used due....
In chain dimension, the dimensions are arranged parallel to each....
Building Construction Aptitude Test more Online Exam Quiz
Building Construction Aptitude Test
Building Construction Assessment
Building Construction Brick Partitions
Building Construction Bricks 1
Building Construction Building Plans 1
Building Construction Campus Interviews
Building Construction Cement 1