Question: In a cavity wall, weep holes are provided at the bottom of the outer skin at an interval of _________ m.

Options

A : 0.5

B : 1

C : 1.5

D : 2

Click to view Correct Answer

Next

Building Construction General Features Cavity Walls more questions

Calculate the power factor using the data: P=15 W, S=25....

What is the noise to signal ratio if the phase....

Calculate the number of moles in 42 grams of NaHCO3?

What is the pressure of 380 torr in atm?

What is the value of kb in nominal bearing strength....

Voltage gain of common drain amplifier is always slightly less....

What is the specific gravity of 5 Kg of water....

Find the reflection coefficient of the wave passing through two....

In simple reinforced cement concrete slab flooring, it is important....

Find the ratio of the refractive index of medium 1....

Building Construction Aptitude Test more Online Exam Quiz

Building Construction Experienced

Building Construction Ferrous Metals 1

Building Construction Flat Terraced Roofing

Building Construction Freshers

Building Construction Functional Requirements Ventilation System

Building Construction Glass 1

Building Construction Glass 2

Building Construction Hollow Clay Blocks Masonry

Building Construction Interview

Building Construction Interview Experienced