Question: If h = height of sand when moist and h1 is the height when saturated then what is the percentage of bulking?
Options
A : {(h-h1)/h1}*100
B : {(h1-h)/h1}*100
C : {(h-h1)/h}*100
D : {(h1-h)/h}*100
Concrete Technology Bulking Aggregates more questions
What is the default calling convention for a compiler in....
Which among the following option is the full set of....
Which of the following relations is the reflexive relation over....
The transitive closure of the relation {(0,1), (1,2), (2,2), (3,4),....
Consider the binary relation, A = {(a,b) | b =....
For a, b ? R de?ne a = b to....
Which of the following statement is incorrect with respect to....
A = {?,{?},2,{2,?},3}, which of the following is true?
What will be the lexicographical order of combinations of 2....
Consider the congruence 45?3(mod 7). Find the set of equivalence....
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Concrete Technology Advantages Quality Control
Concrete Technology Aptitude Test
Concrete Technology Assessment
Concrete Technology Campus Interviews
Concrete Technology Chemical Composition Test
Concrete Technology Classification Aggregates