Question: If h = height of sand when moist and h1 is the height when saturated then what is the percentage of bulking?

Options

A : {(h-h1)/h1}*100

B : {(h1-h)/h1}*100

C : {(h-h1)/h}*100

D : {(h1-h)/h}*100

Click to view Correct Answer

Next

Concrete Technology Bulking Aggregates more questions

What is the default calling convention for a compiler in....

Which among the following option is the full set of....

Which of the following relations is the reflexive relation over....

The transitive closure of the relation {(0,1), (1,2), (2,2), (3,4),....

Consider the binary relation, A = {(a,b) | b =....

For a, b ? R de?ne a = b to....

Which of the following statement is incorrect with respect to....

A = {?,{?},2,{2,?},3}, which of the following is true?

What will be the lexicographical order of combinations of 2....

Consider the congruence 45?3(mod 7). Find the set of equivalence....

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Concrete Technology Advantages Quality Control

Concrete Technology Agents

Concrete Technology Aptitude Test

Concrete Technology Assessment

Concrete Technology Basic

Concrete Technology Campus Interviews

Concrete Technology Chemical Composition Test

Concrete Technology Classification Aggregates

Concrete Technology Compression Test

Concrete Technology Concept Concrete Mix Design