Question: Great skill and skilled labour is required for laying _____________

Options

A : dry rubble masonry

B : ashlar chamfered masonry

C : ashlar fine masonry

D : coursed rubble masonry

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing Labour Rates Workers more questions

In which type of cylinder liner cooling is more efficient?

What is the meaning of slip?

A layer of packing above the liquid distributor is called?

Which of the following is not a type of developer?

Which method of forming is used for heavily profiled tiles?

In _______ masonry, the stones of irregular sizes and shapes....

Identify the type of stone masonry.

Which of the following core cannot be classified by the....

Which kind geothermal plant is most common type?

Which of the below is suitable for soft sandy foundation?

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Interview

Civil Engineering Drawing Interview Experienced

Civil Engineering Drawing Interview Freshers

Civil Engineering Drawing Isometric Projection

Civil Engineering Drawing Jack Arched Flat Terraced Roof

Civil Engineering Drawing Line Planned Storeyed Buildings

Civil Engineering Drawing Lines Lettering Dimensioning

Civil Engineering Drawing Loci Points

Civil Engineering Drawing Madras Terraced Sloping Roof

Civil Engineering Drawing Masonry Platformwater Tankmotor Garage