Question: Centring and shuttering for flat surfaces- 4 beldars and 4 carpenters (2 class) can do 9.6 sq m (96 sq ft) per day.

Options

A : True

B : False

C :

D :

Click to view Correct Answer

Previous || Next

Civil Engineering Drawing Basic more questions

Cells are the structural unit of life and all the....

Cellular metabolism is a non-equilibrium metabolism.

Cement is a material with adhesive and cohesive properties.

Centrifugal casting is a method of casting which works on....

Centrifugation is a type of dewatering process.

Certain agents may be converted to mutagenic compounds by the....

Certificates generated by X that are the certificates of other....

Cesium-silver oxide cells are sensitive to the near infrared wavelengths.

Chan’s algorithm can be used to compute the lower envelope....

Chances in females are more than in men.

Chemical Engineering Basics - Part 1 more Online Exam Quiz

Civil Engineering Drawing Analysis Rate Road Work

Civil Engineering Drawing Aptitude Test

Civil Engineering Drawing Arch Masonry Calculation

Civil Engineering Drawing Arrangements Rooms Position Purposes

Civil Engineering Drawing Assessment

Civil Engineering Drawing Brickwork Woodwork Stone Masonry

Civil Engineering Drawing Building Bye Laws

Civil Engineering Drawing Campus Interviews

Civil Engineering Drawing Classification Timber Carpenters Work

Civil Engineering Drawing Computer Aided Drafting