Question: Centring and shuttering for flat surfaces- 4 beldars and 4 carpenters (2 class) can do 9.6 sq m (96 sq ft) per day.
Options
A : True
B : False
C :
D :
Civil Engineering Drawing Basic more questions
Cells are the structural unit of life and all the....
Cellular metabolism is a non-equilibrium metabolism.
Cement is a material with adhesive and cohesive properties.
Centrifugal casting is a method of casting which works on....
Centrifugation is a type of dewatering process.
Certain agents may be converted to mutagenic compounds by the....
Certificates generated by X that are the certificates of other....
Cesium-silver oxide cells are sensitive to the near infrared wavelengths.
Chan’s algorithm can be used to compute the lower envelope....
Chances in females are more than in men.
Chemical Engineering Basics - Part 1 more Online Exam Quiz
Civil Engineering Drawing Analysis Rate Road Work
Civil Engineering Drawing Aptitude Test
Civil Engineering Drawing Arch Masonry Calculation
Civil Engineering Drawing Arrangements Rooms Position Purposes
Civil Engineering Drawing Assessment
Civil Engineering Drawing Brickwork Woodwork Stone Masonry
Civil Engineering Drawing Building Bye Laws
Civil Engineering Drawing Campus Interviews
Civil Engineering Drawing Classification Timber Carpenters Work