Question: A slump of 50-100mm can be used for:

Options

A : Mass concreting

B : Strip footing

C : Trench fill

D : Beams

Click to view Correct Answer

Previous || Next

Basic Civil Engineering Online Test more questions

The mechanical energy balance is the product of the equation....

Which of the following is not conserved for the flow....

The 12v DC Fan present in the Pump Circulation System....

Calculation of _____________ is the fundamental of flow sheeting codes.

The concentration of multi component mixture in mass transfer process,....

The law of _____________ states that chemical reactions proceed with....

The physical principle behind the continuity equation is __________

The magnitude of runoff as ordinates against the corresponding percentage....

We don`t use volume balance in a chemical process because

What happens when a neutron is absorbed by a nucleus....

Basic Civil Engineering more Online Exam Quiz

Basic Civil Engineering Mcqs

Basic Civil Engineering Methods Levelling

Basic Civil Engineering Mortar

Basic Civil Engineering Multiple Choice

Basic Civil Engineering Online Quiz

Basic Civil Engineering Painting

Basic Civil Engineering Plane Table Surveying

Basic Civil Engineering Plastering

Basic Civil Engineering Properties Cement

Basic Civil Engineering Properties Concrete