Question: The black box concept is based on the assumption(s) that;

Options

A : the suprasystem is stable

B : black boxes are dependent or environments

C : the relationship between the inputs and output is stable

D : All of the above

Click to view Correct Answer

Previous || Next

System Analysis and Design - Part 6 more questions

A couple:

Which of the following is not a characteristic of structured....

An audit trial is

Which of the following does not occur in phase -....

The procedure for evaluating the relative performance of different computers,....

Which of the following might be output as a result....

Programmers refer to the items needed to reach a problem's....

Which of the following is not an advantage of the....

Benchmarking is used

The first items defined for a new system are its....

Artificial Intelligence - Part 1 more Online Exam Quiz

Operating Systems Concepts - Part 5

System Analysis and Design - Part 2

System Analysis and Design - Part 3

System Analysis and Design - Part 4

System Analysis and Design - Part 5

Unix - Part 2

Unix - Part 3

Windows 2000 Server - Part 2

Windows NT - Part 2

Constructors and Destructors - Programs