Question: Requirements also serve as an evaluation checklist at the end of the development project, so they are sometimes called _____.

Options

A : System Development Life Cycle

B : CASE tool

C : Phased Conversion

D : Success factors

Click to view Correct Answer

Next

System Analysis and Design - Part 6 more questions

What type of software is most useful in financial planning....

The time lag, between the keying of the last character....

Which of the following is not a characteristic of a....

The main purpose of the system investigation phase is to....

The model base cannot be prepared until

A couple:

Which of the following is not a characteristic of structured....

An audit trial is

Which of the following does not occur in phase -....

The procedure for evaluating the relative performance of different computers,....

Artificial Intelligence - Part 1 more Online Exam Quiz

Operating Systems Concepts - Part 5

System Analysis and Design - Part 2

System Analysis and Design - Part 3

System Analysis and Design - Part 4

System Analysis and Design - Part 5

Unix - Part 2

Unix - Part 3

Windows 2000 Server - Part 2

Windows NT - Part 2

Constructors and Destructors - Programs