Question: Which of the following systems implementation approaches should be used if you want to run the old system and the new system at the same time for a specified period?

Options

A : direct

B : pilot

C : parallel

D : phased

Click to view Correct Answer

Previous || Next

System Analysis and Design - Part 2 more questions

The principles of structured programming forbid the use of

Which of the following capabilities is required for a system....

In top down analyis and design

The _____ symbol is used in a flowchart to represent....

System prototyping helps the designer in

Main characteristic of "ring", in Data structure, is

Which of the following is not considered as a tool....

To avoid errors in transcription and transposition, during data entry,....

Sequential or series testing is

A consideration evaluated by management when planning to convert to....

Artificial Intelligence - Part 1 more Online Exam Quiz

Object Oriented Programming Using C++ - Part 11

Operating Systems Concepts - Part 2

Operating Systems Concepts - Part 3

Operating Systems Concepts - Part 4

Operating Systems Concepts - Part 5

System Analysis and Design - Part 3

System Analysis and Design - Part 4

System Analysis and Design - Part 5

System Analysis and Design - Part 6

Unix - Part 2